Moss Vale Road Waste Water Infrastructure Update

August - September 2022 Update

  • Package 1: Moss Vale Road Southern (MVRS) Urban Release Area URA Wastewater (WW) Infrastructure
    • MVRS rising main installed
    • MVR Southern URA gravity trunk main installed
    • MVRS sewer pump station (SPS) construction and installation commenced
  • Package 2: Moss Vale Road (MVR) – Sewer Pumping Stations (SPS)
    • MVRN SPS access road continued
    • MVRN SPS property settlement completed
  • Package 3: Moss Vale Road (MVR) Urban Release Area (URA) – Pipelines
    • MVRS gravity trunk main installation continued
    • MVRS rising main installed
    • SPS23 rising main diversion continued
    • MVRN rising main installation continued
    • MVRN rising main highway under bore works commenced.

Images: Waste Water Pipeline and Shorage box



Share on Facebook Share on Twitter Share on Linkedin Email this link