Moss Vale Road Waste Water Infrastructure Update
August - September 2022 Update
-
Package 1: Moss Vale Road Southern (MVRS) Urban Release Area URA Wastewater (WW) Infrastructure
- MVRS rising main installed
- MVR Southern URA gravity trunk main installed
- MVRS sewer pump station (SPS) construction and installation commenced
-
Package 2: Moss Vale Road (MVR) – Sewer Pumping Stations (SPS)
- MVRN SPS access road continued
- MVRN SPS property settlement completed
-
Package 3: Moss Vale Road (MVR) Urban Release Area (URA) – Pipelines
- MVRS gravity trunk main installation continued
- MVRS rising main installed
- SPS23 rising main diversion continued
- MVRN rising main installation continued
- MVRN rising main highway under bore works commenced.
Images: Waste Water Pipeline and Shorage box