Share ICOLL Flash Flood Warning System Scoping Study on FacebookShare ICOLL Flash Flood Warning System Scoping Study on TwitterShare ICOLL Flash Flood Warning System Scoping Study on LinkedinEmail ICOLL Flash Flood Warning System Scoping Study link
Council received grant funding from the Australian Government, through the (then) National Recovery and Resilience Agency’s Preparing Australian Communities Program – Local Stream, to undertake a scoping study for the implementation of a Total Flood Warning System (TFWS) covering three catchments within the Shoalhaven LGA. The three catchment areas are Burrill Lake, Lake Conjola and Tabourie Lake. These catchments are characterised by being exposed to flash flooding and comprising Intermittently Closed and Open Lakes and Lagoons (ICOLLs) with existing low-lying historic development adjacent to these coastal lakes.
Measures to improve flood warning and response through the implementation of a TFWS were recommended in the individual catchments' Floodplain Risk Management Study and Plans (FRMS&P) to reduce flood impacts and the risk to life within these catchments. This project will be undertaken in accordance with the NSW Flood Prone Land Policy, the NSW Flood Risk Management Manual (2023) and in close collaboration with the NSW State Emergency Service (SES), the NSW Department of Climate Change, Energy, the Environment and Water (DCCEEW), and other agencies and stakeholders.
Council has engaged a contractor, Manly Hydraulics Laboratory (MHL), to assist with the preparation of the ICOLL Catchments Flash Flood Warning System Scoping Study.
Project Objectives
The primary objectives of this study are to scope the requirements and determine feasible options for the implementation of a fit-for-purpose location-based flash flood warning system for the three catchments to predict lake levels in a flood event, provide early warning, and assist with flood response and pre-flood entrance management procedures. The scoping study will also provide advice on the system design for an optimal TFWS based on the scoping work, which includes operational protocols and preliminary costing for both the capital and ongoing maintenance costs of the systems for Council consideration.
Consultation
Community consultation is an important role for the successful implementation of a TFWS. Comprehensive community consultation will be undertaken throughout the project.
Council received grant funding from the Australian Government, through the (then) National Recovery and Resilience Agency’s Preparing Australian Communities Program – Local Stream, to undertake a scoping study for the implementation of a Total Flood Warning System (TFWS) covering three catchments within the Shoalhaven LGA. The three catchment areas are Burrill Lake, Lake Conjola and Tabourie Lake. These catchments are characterised by being exposed to flash flooding and comprising Intermittently Closed and Open Lakes and Lagoons (ICOLLs) with existing low-lying historic development adjacent to these coastal lakes.
Measures to improve flood warning and response through the implementation of a TFWS were recommended in the individual catchments' Floodplain Risk Management Study and Plans (FRMS&P) to reduce flood impacts and the risk to life within these catchments. This project will be undertaken in accordance with the NSW Flood Prone Land Policy, the NSW Flood Risk Management Manual (2023) and in close collaboration with the NSW State Emergency Service (SES), the NSW Department of Climate Change, Energy, the Environment and Water (DCCEEW), and other agencies and stakeholders.
Council has engaged a contractor, Manly Hydraulics Laboratory (MHL), to assist with the preparation of the ICOLL Catchments Flash Flood Warning System Scoping Study.
Project Objectives
The primary objectives of this study are to scope the requirements and determine feasible options for the implementation of a fit-for-purpose location-based flash flood warning system for the three catchments to predict lake levels in a flood event, provide early warning, and assist with flood response and pre-flood entrance management procedures. The scoping study will also provide advice on the system design for an optimal TFWS based on the scoping work, which includes operational protocols and preliminary costing for both the capital and ongoing maintenance costs of the systems for Council consideration.
Consultation
Community consultation is an important role for the successful implementation of a TFWS. Comprehensive community consultation will be undertaken throughout the project.
We would greatly value any feedback from our community as we start investigating flash flood warning system options for Burrill Lake, Lake Conjola and Tabourie Lake.
Please complete the short online survey below. It will only take about 10 minutes of your time.
All information provided will be confidential and used only for the purpose of the study.
Please complete the online survey by 5 pm, Sunday 18 June 2023.
We look forward to working with you over the course of this project.
Share Online Survey - ICOLL Catchments Flash Flood Warning System Scoping Study on FacebookShare Online Survey - ICOLL Catchments Flash Flood Warning System Scoping Study on TwitterShare Online Survey - ICOLL Catchments Flash Flood Warning System Scoping Study on LinkedinEmail Online Survey - ICOLL Catchments Flash Flood Warning System Scoping Study link
Page last updated: 12 Aug 2024, 09:34 AM
Follow Project
Stay informed
Subscribe for project updates
Lifecycle
Community Consultation
ICOLL Flash Flood Warning System Scoping Study has finished this stage
May to June 2023
Feedback Under Consideration
ICOLL Flash Flood Warning System Scoping Study has finished this stage
From June 2023
Community Drop-in Sessions
ICOLL Flash Flood Warning System Scoping Study has finished this stage
Where: Burrill Lake Community Hall When: Tuesday 14 November 2023 Time: 3 pm – 6:30 pm
Where: Lake Conjola Community Centre When: Wednesday 15 November 2023 Time: 3 pm – 6:30 pm
Public Exhibition of Draft Options Report
ICOLL Flash Flood Warning System Scoping Study has finished this stage
30 October to 3 December 2023
Total Flood Warning System Detailed Design
ICOLL Flash Flood Warning System Scoping Study is currently at this stage
December 2024
Project Completion
this is an upcoming stage for ICOLL Flash Flood Warning System Scoping Study